Page 1
Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 2
1995), or as a “commercial item” as defined in FAR 2.101(a) or as “Restricted computer software” as defined in FAR 52.227-19 (June 1987) or any equivalent agency regulation or Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
I understand that if the installation site is not prepared in accordance with the enclosed instructions, additional installation charges may apply. Company name: Company address: Name: Position: Telephone: Preferred installation date: Signed: Date: Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Other Precautions 2. Introduction Installation Guidelines 3. Laboratory Environment Environmental Conditions Installation category Pollution level Temperature Control Cleanliness Instrument Cooling Air Supply Workbench Location PC Requirements 4. Instrument Shipping Information Weights and Dimensions Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 6
Power plugs and cords Gas Supplies Water Chiller System Location Waste Fluid Container Guidelines for Software Installation 6. Accessories and Options Vapor Generation Accessory (VGA) Recommended Gases Important Customer Web Links Appendix A: Power Cords Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Move cylinders only by securing them to a properly constructed trolley. Use only approved regulator and hose connectors (refer to the gas supplier’s instructions). Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
After all safety regulations have been met, check the checklist box: Principal installation area is in compliance with all relevant safety regulations. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
The installation will include the following: Spectrometer installation Water chiller connection Instrument software installation and registration Accessory installation Spectrometer installation performance tests Basic customer training Maintenance overview Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 10
Introduction This page is intentionally left blank. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
This is supplied to the instrument through an air supply vent located at the top, front of the instrument. The vent is fitted with a dust filter, to filter out particulate matter from the surrounding environment. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Accessories such as the Sample Preparation System (SPS) Autosampler, PC and printer can be positioned on a trolley. A specially designed SPS trolley is available from Agilent. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Leave enough space in front and to the left side of the instrument to provide easy access to the mains power on/off switch at all times. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 15
The location of the workbench may be determined by the position of the exhaust flue required to remove fumes and vapors from the spectrometer sample compartment (see Section 5). Figure 2. Front view of instrument Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 16
Laboratory Environment Figure 3. Top view of instrument Figure 4. Rear view of instrument Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Windows 10 Professional 64-bit Windows 10 Professional 64-bit Higher rated PC components can be substituted for those listed above for example, processor type, amount of memory, screen size and resolution and operating system version. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 18
Laboratory Environment This page is intentionally left blank. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
368 mm (14.5 in) 702 mm (27.6 in) 575 mm (22.6 in) 82 kg (181 lb) SPS 4 Autosampler 600 mm (23.6 in) 363 mm (14.3 in) 510 mm (20.1 in) 15 kg (33.1 lb) Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
If necessary, insert tie down brackets into mounting slots, create corresponding holes in the table, and secure the brackets with bolts. Seismic brackets are not supplied by Agilent. Prepare these items separately. NOTE Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 21
Instrument Shipping Information Right side Left side 3 mm 30 mm 17 mm Bracket (example) Figure 5. Slots for seismic tie down Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 22
Instrument Shipping Information This page is intentionally left blank. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
The fan control switch and running indicator lamp should be located in a position where the instrument operator can view the indicator and access the control switch. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 24
Agilent. Otherwise, the customer is responsible for supplying the ductwork between the instrument and the lab extraction system. To allow for personal preferences, control gear switch and pilot light assemblies are not supplied by Agilent. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Avoid using power supplies from a source that may be subject to electrical interference from other services (such as large electric motors, elevators, welders and air conditioning units). Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
RMS at 200 to 220 volts and 13 amps at 230-240 volts (2.9 kVA) with a power factor of approximately 0.99. (Can be a cross phase connection to achieve specified supply voltage). Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Portable Liquid Cylinders (PLC). Table 6. Gas supply requirements Component Plasma, nebulizer, optics interface purge Argon Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 28
The user (or other authorized personnel) must carry out appropriate leak tests necessary to ensure safety on the gas and liquid connections that the operator is directed to assemble during installation, normal use or maintenance. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 29
Fittings for the regulator end must be supplied by the customer. Alternatively, a fittings kit can be ordered from Agilent Technologies. See the Agilent website at www.agilent.com for ordering information. Customers must provide connection from the gas supply to a shutoff valve.
For water chillers not provided by Agilent, consult the documentation that came with it for appropriate coolants. The water chillers must meet the following requirements. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Please see the Agilent website for part numbers for ordering additional hose by the meter and clamps: www.agilent.com After the water cooling requirements have been met, check the checklist box: Water cooling/circulation system and power connections are set up. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
NOTE The Agilent service engineer will connect the PC to the spectrometer and any factory-approved accessories purchased at installation. Initial instrument software installation is also included as part of the system installation. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 33
Laboratory Facilities This page is intentionally left blank. Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Need to get information on your product? Literature Library - http://www.agilent.com/chem/library Need to know more? Customer Education – http://www.agilent.com/chem/education Need technical support, FAQs? – http://www.agilent.com/chem/techsupp Need supplies? – http://www.agilent.com/chem/supplies Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
UK, Hong Kong, Singapore, Malaysia, C19, 13 A, BS 1363 (Agilent Part Number 8120-8620) Length 2.5 m (8.2 ft) Switzerland, Denmark, C19, 16 A, 1302 (Agilent Part Number 8120-8622) Length 2.5 m (8.2 ft) Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 37
Thailand, 220 V, 15A, 1.8 M, C19, NEMA 5-15 (Agilent Part Number 8121-1301) Length 1.8 m (5.9 ft) (Not Shown) Brazil, C19 250 V, 16 A, NBR 14136 (Agilent Part Number 8121-1787) Length 2.5 m (8.2 ft) (Not Shown) Agilent 5100 and 5110 ICP-OES Site Preparation Guide...
Page 38
Appendix A – Power Cords Agilent 5100 and 5110 ICP-OES Site Preparation Guide...