Siemens SIRIUS 3RW55 Equipment Manual page 59

Soft starters and solid-state switching devices
Hide thumbs Also See for SIRIUS 3RW55:
Table of Contents

Advertisement

Illustration similar
Installation without a crane
• Remove the terminal cover
starter has been mounted completely (Page 76).
• Screw the lower 2 screws into the mounting plate
• Ensure that both screws protrude at least 4 cm and then place the 3RW55 soft starter onto
the 2 lower screws
• Tilt the 3RW55 soft starter up so that it is resting level against the mounting plate
tighten all 4 screws with the specified torque
Installation with a crane
• Remove the terminal cover
starter has been mounted completely (Page 76).
• Screw the lower 2 screws into the mounting plate
protruding at least 4 cm.
• Use a crane load attachment with 4 hooks to lift the 3RW55 soft starter out of the packaging.
Attach the hooks of the crane load attachment to the cutouts
starter horizontally out of the packaging and set the 3RW55 soft starter down on a horizontal
surface.
• Use a crane load attachment with 2 hooks to mount the 3RW55 soft starter. Attach the hooks
of the crane load attachment to the cutouts
SIRIUS 3RW55 and 3RW55 Failsafe Soft Starters
Equipment Manual, 02/2022, A5E35630887002A/RS-AF/006
4.3 Mount the 3RW55 and 3RW55 Failsafe soft starters on a level surface
that is plugged in on the top and mount it after the 3RW55 soft
from above using the handles
that is plugged in on the top and mount it after the 3RW55 soft
Mounting and dismantling
.
provided (2 people).
.
. Make sure that both screws are
and
.
and
. Lift the 3RW55 soft
59