5.3 PHASE-TO-PHASE ZONE REACH TESTING
Table 5–5: FAULT CURRENT PHASE SETTINGS FOR TEST T14
I Degrees
–25
–55
–85
Reference only
5. Set the fault current to 10.0 (2.0) amps rms. Simultaneously reduce the voltages of the faulted phases and
check that the A1 contact closes when the voltages are within the limits shown in Table 5–5: FAULT CUR-
RENT PHASE SETTINGS FOR TEST T14.
6. Reduce the fault current to zero. Note that the trip target indication concurs with the fault. For example, an
AB fault is displayed as follows:
TRIP AB Z4 "DIST"
where "DIST" is the displayed target.
7. Repeat the test for phase BC and CA faults.
5
1. Protection Settings:
Z1DISTANCE
(101)
Z1PHASE = YES
Z1PREACH = 6.03 Ω
(102)
(104)
Z1P_TIME = 0.0 sec.
Z2DISTANCE
(201)
Z2PHASE = NO
Z3DISTANCE
(301)
Z3PHASE = NO
Z4DISTANCE
(401)
Z4PHASE = NO
LINEINFO
(1204) TRSFMRTYPE = YD1
2. Connect the relay as shown in Figure 5–2: THREE PHASE TEST CONNECTIONS. Set the relay to test
mode 14 (Any Zone 1 Phase). The LUI displays:
ANY Z1 PHASE ON
5-
14
Volts rms
Displayed Target
56 to 63
64 to 72
290 to 310
56 to 63
5.3.5 T15 – 3 PHASE FAULT WITH TRANSFORMER COMPENSATION
LPS-O Line Protection System
5 FUNCTIONAL TESTS (FACTORY SETTINGS)
GE Power Management

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lpsob35u23ve1n

Table of Contents