Installation And Operation; Introduction; Receiving Inspection; Adtran Shipping Contents - ADTRAN MX2800 M13 User Manual

Adtran network adapter user manual mx2800 m13
Table of Contents

Advertisement

1.

INTRODUCTION

The first three tasks for installing and operating the MX2800 are to unpack, inspect, and power up. The
next three subsections detail the tasks. Additional subsections provide information for mounting the
MX2800 into an equipment rack, making the proper connection to the back panel, identifying the front
panel indicators and modular jack, and outlining the addition or removal of a card.
2.

RECEIVING INSPECTION

Carefully inspect the MX2800 for any damage that might have occurred in shipment. If damage is
suspected, file a claim immediately with the carrier, keep the original packaging for damage verification
and/or returning the unit, and contact ADTRAN Customer Service. For warranty information, refer to
Appendix
F, Warranty.
3.

ADTRAN SHIPPING CONTENTS

After unpacking the MX2800 unit but before an initial power up, be sure that the following items are
present:
• MX2800 unit
• DC or AC power supply (Two power supplies come with the Redundant versions.)
• Controller card (Two cards come with the Redundant versions.)
• 8-pin to 6-pin modular cable (modem version only)
• 8-pin to 8-pin modular cable
• 8-pin modular to DB-9 female connector
• Two 4-position terminal lug connectors
• 3-position terminal lug connector
• Six-foot AC power cable (AC version only)
• Mounting ears and screws for 19-inch or 23-inch rack installation
• User manual or CD containing the User Manual
61200290L1-1G
S
2, I
ECTION
NSTALLATION AND
Section 2

Installation and Operation

O
PERATION
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents