Signing-Off The Mx2800 Atp Checklist; Table A-1. Mx2800 Atp Checklist - ADTRAN MX2800 M13 User Manual

Adtran network adapter user manual mx2800 m13
Table of Contents

Advertisement

Appendix A, Acceptance Test Procedure
9.

SIGNING-OFF THE MX2800 ATP CHECKLIST

Use
Table A-1
to identify the MX2800 configuration, identify tests performed, etc.
Acceptance Test Procedure Steps
Verifying the Installed Options
Dual Power Supplies / Dual Power Feeds
Dual Power Supplies / Single Power Feed
Single Power Supply / Dual Power Feeds
Single Power Supply / Single Power Feed
Dual Controllers
Single Controller
Configuring the System
Accessing the Craft Port
Provisioning the DS3 Port
Provisioning the DS1 Ports
Alarm Relay Configuration
Verifying the Data Integrity
DS1 Daisy-Chain to DS3 (Hard) Loopback
DS1 to DS3 "Head-to-Head" Test
DS1 to DS3 (Hard) Loopback
Verifying Alarm Notification
Critical Alarm Relay Test
Noncritical Alarm Relay Test
Verifying System Redundancy
Redundancy Tests (Power Supply and Power Feed as appropriate)
Controller Card Redundancy Test
Autonomous Alarm Reporting
Restoring Default Settings
Configuring the System for Traffic Readiness
NAME:
LOCATION:
A-12

Table A-1. MX2800 ATP Checklist

MX2800 M13 Multiplexer User Manual
Completed
DATE:
RELAY RACK:
61200290L1-1G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents