CTP2000 Hardware Documentation
Related
Documentation
Special Guidelines for Installing CTP2056 Chassis in a Rack
Related
Documentation
Installing the CTP2000 Platform in a Rack
84
WARNING:
At least two people are required to lift the device. Three people
are required for the heavier CTP platforms.
CAUTION:
To prevent electrostatic damage to the device and its components,
make sure that persons handling the device wear an antistatic device.
Before You Install the CTP2000 Platform on page 83
Installing the CTP2000 Platform in a Rack on page 84
Cabling the CTP2000 Platform Overview on page 101
Before installing the CTP2056 platform in a rack, consider the following guidelines:
You can install up to four CTP2056 chassis in a single 7-ft. (2.1-m) rack. Installing
multiple devices in a single rack enables you to maximize your available space.
Install the CTP2056 chassis on the bottom of the rack. Mount lighter devices higher in
the rack.
CTP2000 Rack Requirements on page 39
Installing the CTP2000 Platform in a Rack on page 84
To install the CTP platform in a rack, you need:
Phillips screwdriver
Four 10-32 x 3/8 Phillips screws for each device to be installed
Follow these guidelines:
Following your installation plan, use a tape measure and marking pen to measure and
1.
mark space on each equipment rack for each platform component. For horizontal
spacing, follow Network Equipment Building System (NEBS) requirements.
With one person standing on the left side of the device and another standing on the
2.
right side, lift the device into the rack.
Position the device in its designated location in the equipment rack. Make sure the
3.
holes of the mounting brackets align evenly with the holes of the equipment rack on
both sides.
Copyright © 2017, Juniper Networks, Inc.