Installation Safety Guidelines And Warnings; M120 Chassis Lifting Guidelines - Juniper M120 Hardware Manual

Multiservice edge router
Hide thumbs Also See for M120:
Table of Contents

Advertisement

CHAPTER 38
Installation Safety Guidelines and
Warnings

M120 Chassis Lifting Guidelines

Related
Documentation
Copyright © 2018, Juniper Networks, Inc.
M120 Chassis Lifting Guidelines on page 321
Installation Safety Warnings for Juniper Networks Devices on page 322
The weight of a fully configured chassis is about 225 lb (102.1 kg). Observe these guidelines
for lifting and moving the router:
Before moving the router, read the guidelines in
page 81
to verify that the intended site meets the specified power, environmental, and
clearance requirements.
Do not attempt to lift a fully configured router by yourself. Using a mechanical lift to
maneuver the router into a rack is recommended. If a lift cannot be used, a minimum
of two people must lift the router, and you must remove components from the chassis
before lifting.
Before lifting or moving the router, disconnect all external cables.
As when lifting any heavy object, lift most of the weight with your legs rather than your
back. Keep your knees bent and your back relatively straight and avoid twisting your
body as you lift. Balance the load evenly and be sure that your footing is solid.
Installing the M120 Router Using a Mechanical Lift on page 125
Installing the M120 Router Without Using a Mechanical Lift on page 139
Removing Components from the Chassis Before Installing the M120 Router Without a
Mechanical Lift on page 129
Installation Safety Warnings for Juniper Networks Devices on page 322
"M120 Site Preparation Checklist" on
321

Advertisement

Table of Contents
loading

Table of Contents