Installing The Discharge Tubes - Toro E-Z Vac DFS 78556 Operator's Manual

48in, 52in, 60in, or 72in collection system for z master g3 mower
Table of Contents

Advertisement

5.
Pull the spring-loaded idler pulley back and
route the belt around the mower-deck pulley
(Figure
20).
Note:
Ensure that the belt is routed around the
blower pulleys correctly
Figure 20
1. Mower-deck pulley
2. Spring-loaded Idler pulley
g003399
3. Blower
10
Installing the Discharge
Tubes
Parts needed for this procedure:
1
Upper tube
1
Lower tube
3
Bolt (#10 x 3/4 inches)
3
Locknut (#10)
3
Washer (7/32 inch)
Procedure
Important:
Make sure that the mower deck is in
the lowest height-of-cut position while installing
the discharge tubes.
Note:
Remember to replace the grass deflector when
the bagger is removed from the mower. Refer to
Installing the Grass Deflector (page
1.
Disengage the PTO and set the parking brake.
2.
Stop the engine, remove the key, and wait
for all moving parts to stop before leaving the
operating position.
3.
Lower the mower deck to the lowest height-of-cut
position.
4.
Install the upper tube into the bagger opening
and pull it back out so that the rubber seal is
protruding out
1. Upper tube
2. Bagger opening
5.
Measure the distance the tube is inside the
hood.
18
39).
(Figure
21).
Figure 21
3. Bagger hood
g009223

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-z vac dfs 78566E-z vac dfs 78567

Table of Contents