Note:
Measure from the hood plate to the edge
of the tube as shown in
needs to be 19 mm (3/4 inch).
Figure 22
1. Hood plate
2. Upper tube
3. Hood in the down position
6.
Once the 19 mm (3/4 inch) measurement has
been achieved, mark the upper tube on the
outside where the rubber seal protrudes out
(Figure
23).
Note:
This is marked to ensure the correct
position for the upper tube when drilling the
holes and connecting the upper and lower tubes.
Note:
The rubber seal must protrude out from
the bagger hood.
Figure
22. This distance
g003388
4. 3/4 inch (19 mm)
5. Edge of tube
1. Upper tube
2. Rubber seal protruding out 4. Mark here against the
19
Figure 23
3. Bagger hood
rubber seal.
g003393