Installing The Discharge Tubes; Upper Tube; Lower Tube; Bolt (#10 X 3/4 Inches) - Toro 78555 Operator's Manual

48in and 52in e-z vac twin bagging system or 60in and 72in e-z vac triple bagging system z master g3 mower
Table of Contents

Advertisement

8
Installing the Discharge
Tubes
Parts needed for this procedure:
1

Upper tube

1

Lower tube

3

Bolt (#10 x 3/4 inches)

3

Locknut (#10)

3

Washer (7/32 inch)

Procedure
Important:
Make sure that the mower deck is in
the lowest height-of-cut position while installing
the discharge tubes.
Note:
Remember to replace the grass deflector when
the bagger is removed from the machine. Refer to
Replacing the Grass Deflector (page
1.
Disengage the PTO and engage the parking
brake.
2.
Shut off the engine, remove the key, and wait
for all moving parts to stop before leaving the
operating position.
3.
Lower the machine deck to the lowest
height-of-cut position.
4.
Remove the bags for viewing the tube under
the hood.
5.
Install the upper tube into the bagger opening
and pull it back out so that the rubber seal is
protruding out
(Figure 22
30).
or
Figure
23).
Twin bagger shown
1. Upper tube
2. Bagger opening
Triple bagger shown
1. Upper tube
2. Bagger opening
6.
With the hood in the down position, measure the
distance the tube is inside the hood.
Measure from the hood plate to the edge of the
tube as shown in
Note:
This distance needs to be 19 mm (3/4
inch).
15
Figure 22
3. Bagger hood
Figure 23
3. Bagger hood
Figure
24.
g009304
g009302

Advertisement

Table of Contents
loading

This manual is also suitable for:

7856278563

Table of Contents