Figure 6-5 Cd-Cp00-Us Battery Installation - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100/SV8300
System Hardware Manual

Figure 6-5 CD-CP00-US Battery Installation

2.
Refer to
Figure 6-4 CD-CP00-US Blade with Daughter Boards
Installed on page 6-15
PZ-32IPLA/PZ-64IPLA/PZ-128IPLA daughter board, if
required.
3.
Ensure the power supply is OFF, then slide the CPU into the
CCPU slot in the Controlling Chassis.
4.
If external Background Music (BGM) or Music on Hold (MOH)
is being installed, plug the cable into the CN8 or CN9 pin jack
connector on the CPU. The other end of the cable plugs into
the music source.
Refer to the PGD(2)-U10 ADP in the
SV8100/SV8300 Optional Equipment
PGD(2)-U10 ADP on page 11-1
music source.
When the system software is upgraded, the flash memory is
updated with the new software version. Either the Hot or Cold
start-up method can be used or the system can be upgraded
using system software. Refer to
on page
6-8,
Performing a Software Upgrade on page
to Install the PZ-VM21, PZ-ME50 and/or
for details on connecting to a
2.6.1 Performing a Cold Start
2.6.2 Performing a Hot Start on page
Issue 1.0
Chapter 11 Installing
section
2.1 Using a
6-9, or
2.6.4
6-12.
6 - 19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents