Figure 5-37 Rack Mount 19" Chs1U-Us And Chs2U-Us Chassis - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 1.0
Single
CHS1U-US
One
CHS2U-US
3.5
5 - 34
Repeat for additional chassis mounting.
Rack Mount with
Expansion Chassis

Figure 5-37 Rack Mount 19" CHS1U-US and CHS2U-US Chassis

6.
Connect the ground wire to all chassis. Refer to
Grounding on page 5-46
7.
Refer to
3.5 Installing the 19" Chassis on page 5-34
installation of the chassis or, Chapter 5 paragraph
Extension or Trunk Blade on page 6-4
Installing the 19" Chassis
There are two types of chassis; the controlling (with the CC-CP00 installed)
and the expansion (that does not have the CPU blade installed). As
discussed in other chapters, multiple chassis can be linked together to expand
the port size of the system.
3.5.1
Unpacking the Equipment
Inspect the equipment for any physical damage. If you are not sure
about the function of a component, review the associated information
within this manual. Contact your authorized NEC Sales
Representative if you have additional questions. Note that the
chassis does not initially contain any blades.
Make sure you have appropriate tools for the job, including: a test
set, a punch down tool, and a digital voltmeter.
UNIVERGE SV8100/SV8300
Single
CHS1U-US
Three
CHS2U-US
for complete details on grounding the system.
for installation of blades.
Installing the SV8300 Chassis
Rack Mount with
Expansion Chassis
3.5.7 Install 19" Chassis
to continue
2.2 Installing an

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents