NEC Univerge SV8100 System Hardware Manual page 15

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100/SV8300
___________________________________________________________________________________
Section 3
___________________________________________________________________________________
___________________________________________________________________________________
System Hardware Manual
System Hardware Manual
2.4
Constructing the Main Distribution Frame (MDF) ........................ 4-4
2.5
Power Failure Transfer ............................................................... 4-5
2.6
Fax CO Branch Connection ......................................................... 4-5
Installing the Chassis ..................................................................4-6
3.1
Wall Mounting the 19" Chassis .................................................... 4-7
3.1.1
CHS2U-US Chassis Wall Mount Installation .............................. 4-7
3.2
Floor Mounting the 19" Chassis ................................................. 4-15
3.2.1
CHS2U-US Chassis Installation ............................................... 4-15
3.2.2
Multiple CHS2U-US Chassis Installation ................................. 4-17
3.3
Stand Mounting the 19" Chassis ............................................... 4-19
3.3.1
CHS2U-US Chassis Installation ............................................... 4-19
3.3.2
Multiple CHS2U-US Chassis Installation ................................. 4-22
3.4
Rack Mounting the 19" Chassis ................................................. 4-25
3.5
Installing the 19" Chassis .......................................................... 4-27
3.5.1
Unpacking the Equipment ........................................................ 4-27
3.5.2
Before Installation .................................................................... 4-27
3.5.3
Installing the 19" Controlling Chassis ....................................... 4-28
3.5.4
Installing Expansion Blades in the 19" Chassis (Optional) ...... 4-29
3.5.4.1
3.5.4.2
3.5.4.3
3.5.4.4
3.5.5
Install 19" Chassis Grounding .................................................. 4-39
3.5.6
Install 19" Grounding on Multiple Chassis (Optional) ............... 4-39
3.5.7
Install AC Power Cords ............................................................ 4-40
3.5.8
Install AC Power Cords on Multiple-Chassis (Optional) ........... 4-41
Connector Pin-Out on the PZ-BS10/PZ-BS11 ....................4-30
Install the PZ-BS10 Expansion Base Blade
in the CHS2U-US Controlling Chassis ...............................4-30
Install the PZ-BS11 Expansion Blade in the
CHS2U-US Expansion Chassis ..........................................4-33
Connect the Controlling and Expansion Chassis ...............4-37
Issue 1.0
- v
v

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents