Planet IGS-5225 Series User Manual page 178

L2+ ring managed gigabit ethernet switch
Hide thumbs Also See for IGS-5225 Series:
Table of Contents

Advertisement

While [PC-1] transmit an untagged packet enters Port-1, the Industrial Managed Switch will tag it with a VLAN
1.
Tag=2. [PC-2] and [PC-3] will received the packet through Port-2 and Port-3.
[PC-4],[PC-5] and [PC-6] received no packet.
2.
While the packet leaves Port-2, it will be stripped away it tag becoming an untagged packet.
3.
While the packet leaves Port-3, it will keep as a tagged packet with VLAN Tag=2.
4.
Tagged packet entering VLAN 2
While [PC-3] transmit a tagged packet with VLAN Tag=2 enters Port-3, [PC-1] and [PC-2] will received the packet
5.
through Port-1 and Port-2.
While the packet leaves Port-1 and Port-2, it will be stripped away it tag becoming an untagged packet.
6.
Untagged packet entering VLAN 3
1.
While [PC-4] transmit an untagged packet enters Port-4, the switch will tag it with a VLAN Tag=3.
[PC-5] and [PC-6] will received the packet through Port-5 and Port-6.
2.
While the packet leaves Port-5, it will be stripped away it tag becoming an untagged packet.
3.
While the packet leaves Port-6, it will keep as a tagged packet with VLAN Tag=3.
For this example, VLAN Group 1 just set as default VLAN, but only focus on VLAN 2 and VLAN 3
traffic flow
Setup steps
1.
Add VLAN Group
Add two VLANs – VLAN 2 and VLAN 3
Type 1-3 in Allowed Access VLANs column, the 1-3 is including VLAN1 and 2 and 3.
2.
Assign VLAN Member and PVID for each port:
VLAN 2 : Port-1,Port-2 and Port-3
VLAN 3 : Port-4, Port-5 and Port-6
VLAN 1 : All other ports – Port-7~Port-52
Figure 4-3-3-8: Add VLAN 2 and VLAN 3
178
User's Manual of IGS-5225 series

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents