ADC Soneplex Broadband System Operation And Maintenance Manual page 250

Adc broadband system operation and maintenance manual
Table of Contents

Advertisement

OFFICE A
A END
RTAU
F
INSERT:
NETWORK
B
CPE
QRS
SPLTF
A = "A" TRANSMISSION PATH
B = "B" TRANSMISSION PATH
E = EQUIPMENT (NETWORK)
F = FACILITY (CUSTOMER)
= SIGNAL PRESENCE DETECTOR
= TEST SIGNAL GENERATOR
OR UNFRAMED (QRS)
= TERMINATED SIGNAL
Figure 570-12. Typical Point-to-Point Test Configuration
EQUIPMENT (E)
[NETWORK]
DS3 MUX
RTAU
ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance
INTEROFFICE
FACILITY
A
E
DROP:
CUSTOMER
INSERT:
CUSTOMER
FACILITY (F)
[CUSTOMER]
A
B
CIRCUIT
UNDER TEST
SPLTFL
SIGNAL
PRESENCE
DETECTOR
TEST SIGNAL
GENERATOR
Figure 570-13. SPLTFL and SPLTEL
OFFICE Z
RTAU
E
A
DROP:
NETWORK
INSERT:
NETWORK
B
SPLTE
EQUIPMENT (E)
[NETWORK]
DS3 MUX
A
B
CIRCUIT
UNDER TEST
SPLTEL
TEST SIGNAL
GENERATOR
RTAU
SIGNAL
PRESENCE
DETECTOR
© 2000, ADC Telecommunications, Inc.
DLP-570
Page 17 of 18
Z END
F
INSERT:
CUSTOMER
CPE
QRS
11870-B
FACILITY (F)
[CUSTOMER]
11871-B
2-227

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents