Connect Power To The Ptx5000 High Capacity Delta Ac Pdus - Juniper PTX5000 Quick Start Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

Connect Power to the PTX5000 High Capacity Delta AC PDUs

To connect an AC power cord to a High Capacity Delta AC PDU (see
Figure 36: High Capacity Delta AC PDU
1
Top installation handle
2
Front installation handle
3
PDU OK LED
4
Power switch labeled (|) for the on position and ( )
for the standby position.
5
Air exhaust ventilation
1. Switch off the customer-site circuit breakers. Ensure that the voltage across the AC power source is 0
V and that there is no chance that the voltage might become active during installation.
2. Switch the power switch on the PDU faceplate to the standby ( ) position.
3. Using a number 2 Phillips (+) screwdriver, remove the four screws from the metal retaining bracket
located on the lower right of the PDU. Remove the metal retaining bracket from the PDU (see
Figure 37 on page
46).
Figure 36 on page
6
Input voltage LED
7
Wiring compartment
8
Power input cord selection switch
9
Metal retaining bracket
10
Wiring compartment door
45
45):

Advertisement

Table of Contents
loading

Table of Contents