Figure 9-17 Busbar Package - Siemens Sinamics GM150 6SL3835-2LN44-2AA0 Operating And Installation Instructions

Medium-voltage drive
Table of Contents

Advertisement

Maintenance
9.5 Repair
4. Remove the screwed connections for the phase connections
5. To remove the upper phase module, unscrew the motor voltage sensing module. Release
200
IGCT phase module and the drive cabinet on the rear of the drive.
Figure 9-17
Busbar package
the side screws
. Ensure that the connected fiber-optic cable and connecting cable are
not damaged.
Figure 9-18
Motor current acquisition module
on the interfaces with the
SINAMICS GM150 6SL3835-2LN44-2AA0
Operating Instructions Rev.201910281250 MUSTER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents