Siemens Sinamics GM150 6SL3835-2LN44-2AA0 Operating And Installation Instructions page 204

Medium-voltage drive
Table of Contents

Advertisement

Maintenance
9.5 Repair
9. Fasten the four eyebolts
10.Lift up the phase module and put it to one side.
11.Now lift the new phase module in the same manner from the transport packaging. Place the
See also
Attaching the changing device to the stacker (Page 196)
Installing a phase module
Installing the module
1. Install the intact module in the reverse order of the previously described steps.
2. When tightening the screws, make sure that you use the appropriate torque (Page 193)
3. Tighten the joints between the water pipes by hand.
Performing final checks
1. Open the valves.
2. Make sure that the connections are tight.
3. Make sure that the flow is ensured once the re-cooling unit has been switched in.
204
the eyelets on the fork.
phase module on the changing device.
permissible for each screw type.
on the phase module. Position the stacker so that you can hang
SINAMICS GM150 6SL3835-2LN44-2AA0
Operating Instructions Rev.201910281250 MUSTER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents