Installation; Transporting The Boiler/Stratification Cylinder; Checking The Delivery - Wolf COB-2 Operation Instructions Manual

Oil condensing boiler for central heating with stratification cylinder
Table of Contents

Advertisement

Installation

5
Installation
5.1
Transporting the boiler/stratification cylinder
Transport the heat generator and cylinder with packaging and pallet.
A sack truck is a suitable for this.
Fig. 5.1
Transporting the boiler/stratification cylinder
► Position a sack truck at the rear of the heat generator and cylinder.
► Place a strap around the heat generator.
► Transport to the installation site.
► Remove strap and packaging.
► Remove the fixing screws on the pallet.
► Lift the heat generator and cylinder off the pallet.
5.2

Checking the delivery

The following parts are included with the COB-2 and COB-2-TS:
Standard delivery
COB-2-15/20/29/40 oil condensing boiler
TS-15/20/29 stratification cylinder
Trap with hose
Stainless steel cleaning brush
Maintenance tools
COB-2 / COB-2-TS installation instructions
COB-2 / COB-2-TS operating instructions
COB-2 / COB-2-TS service instructions
Oil filter insert 40 μm
30 | WOLF GmbH
COB-2
COB-2-TS
-
3066501_201910

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cob-2-ts

Table of Contents