Installing The Safety Assembly And Pipe Assembly - Wolf COB-2 Operation Instructions Manual

Oil condensing boiler for central heating with stratification cylinder
Table of Contents

Advertisement

Installation
Fig. 5.4
Level the heat generator
Adjustable feet
q
5.5

Installing the safety assembly and pipe assembly

► Install the safety assembly and necessary pipe assemblies.
Number of pipe assemblies
1-2
>3
Safety assembly
► Install the safety assembly for the heating flow and return.
► Route the discharge pipes of the safety valves into a drain outlet.
Fig. 5.5
Safety assembly with levelling part
Pipe assembly
► Install the pipe assembly on the safety assembly.
q
Fig. 5.6
Pipe assemblies
Pipe assembly for 1 heating circuit
q
32 | WOLF GmbH
q
Possible installation position
– Side casing
– Wall (left, right, rear)
– Wall (left, right, rear)
w
Pipe assembly for 2 or 3 heating circuits with
w
manifolds
3066501_201910

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cob-2-ts

Table of Contents