Wolf COB-2 Operation Instructions Manual page 3

Oil condensing boiler for central heating with stratification cylinder
Table of Contents

Advertisement

Table of contents
5.7.2
Connecting the anti-lift valve ...................................................................................................................... 35
5.8
Connecting the condensate drain .............................................................................................................. 36
5.8.1
Connecting the trap .................................................................................................................................... 36
5.8.2
Connecting the condensate pump ............................................................................................................. 36
5.8.3
Connecting the neutralising box ................................................................................................................. 37
5.9
Connecting the balanced flue ..................................................................................................................... 38
5.9.1
Installing the balanced flue ......................................................................................................................... 38
5.9.2
Installing the flue gas damper (cascade operation only) ............................................................................ 40
5.9.3
Installing the roof outlet .............................................................................................................................. 40
5.10
Electrical connection .................................................................................................................................. 40
5.10.1 Power supply .............................................................................................................................................. 40
5.10.2 Terminal box delivered condition ................................................................................................................ 41
5.10.3 Removing the terminal box ........................................................................................................................ 41
5.10.4 Installing the terminal box on the wall ........................................................................................................ 42
5.10.5 Connecting the terminal box ...................................................................................................................... 43
5.11
Connecting the stratification cylinder ......................................................................................................... 45
5.12
Filling the heating system and checking for leaks ...................................................................................... 46
5.12.1 Filling the heating system .......................................................................................................................... 46
5.12.2 Checking the hydraulic pipework for leaks ................................................................................................. 46
5.13
Checking the pH value ............................................................................................................................... 46
5.14
Control modules ......................................................................................................................................... 46
5.14.1 Selecting a slot ........................................................................................................................................... 47
6
Commissioning ......................................................................................................................... 48
6.1
Preparation for commissioning ................................................................................................................... 48
6.2
Putting the heat generator into service ...................................................................................................... 48
6.3
Plugging in the control module ................................................................................................................... 49
6.4
Turning on the heat generator .................................................................................................................... 49
6.5
Configuring the system .............................................................................................................................. 50
6.6
Venting pumps and TS stratification cylinder ............................................................................................. 50
6.6.1
Venting feed/heating circuit pump .............................................................................................................. 50
6.6.2
Vent heating circuit of the TS stratification cylinder .................................................................................... 50
6.6.3
Venting the oil pump ................................................................................................................................... 51
6.7
6.7.1
Checking the flue system ........................................................................................................................... 51
6.7.2
2
6.7.3
levels ...................................................................................................................................... 52
2
6.7.4
Changing the oil pump pressure ................................................................................................................ 53
6.7.5
6.8
Commissioning cascade ............................................................................................................................ 54
6.8.1
Setting the eBus address in the programming unit or display module ....................................................... 54
6.8.2
Check that the flue gas damper is functioning properly ............................................................................. 54
6.8.3
Check that the flue cascade dampers are free of leaks ............................................................................. 55
6.9
Configuring the heat generator .................................................................................................................. 56
6.10
Finishing the commissioning process ........................................................................................................ 56
7
Parameter settings ................................................................................................................... 57
7.1
Parameter list ............................................................................................................................................. 57
7.2
Parameter descriptions .............................................................................................................................. 58
7.2.1
HG01: Burner hysteresis ............................................................................................................................ 58
7.2.2
HG07: Run-on time, heating circuit pump .................................................................................................. 58
7.2.3
HG08: Maximum boiler water temperature HTG T-Flowmax ..................................................................... 58
7.2.4
HG09: Burner cycle block .......................................................................................................................... 58
7.2.5
HG10: eBus address of the heat generator ............................................................................................... 59
7.2.6
HG13: Function input E1 ............................................................................................................................ 59
7.2.7
HG14: Function output A1 .......................................................................................................................... 60
7.2.8
HG15: Cylinder hysteresis ......................................................................................................................... 61
7.2.9
HG16: Minimum heating circuit pump rate ................................................................................................. 61
7.2.10 HG17: Maximum heating circuit pump rate ................................................................................................ 61
7.2.11 HG19: Run-on time, cylinder primary pump ............................................................................................... 61
3066501_201910
......................................................................................................................................... 51
2
2
WOLF GmbH | 03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cob-2-ts

Table of Contents