Table of contents
5.7.2
Connecting the anti-lift valve ...................................................................................................................... 35
5.8
5.8.1
Connecting the trap .................................................................................................................................... 36
5.8.2
5.8.3
5.9
Connecting the balanced flue ..................................................................................................................... 38
5.9.1
Installing the balanced flue ......................................................................................................................... 38
5.9.2
5.9.3
Installing the roof outlet .............................................................................................................................. 40
5.10
Electrical connection .................................................................................................................................. 40
5.10.1 Power supply .............................................................................................................................................. 40
5.11
5.12
5.13
Checking the pH value ............................................................................................................................... 46
5.14
Control modules ......................................................................................................................................... 46
5.14.1 Selecting a slot ........................................................................................................................................... 47
6
Commissioning ......................................................................................................................... 48
6.1
Preparation for commissioning ................................................................................................................... 48
6.2
6.3
6.4
Turning on the heat generator .................................................................................................................... 49
6.5
Configuring the system .............................................................................................................................. 50
6.6
6.6.1
6.6.2
6.6.3
Venting the oil pump ................................................................................................................................... 51
6.7
6.7.1
Checking the flue system ........................................................................................................................... 51
6.7.2
2
6.7.3
levels ...................................................................................................................................... 52
2
6.7.4
6.7.5
6.8
Commissioning cascade ............................................................................................................................ 54
6.8.1
6.8.2
6.8.3
6.9
6.10
7
Parameter settings ................................................................................................................... 57
7.1
Parameter list ............................................................................................................................................. 57
7.2
Parameter descriptions .............................................................................................................................. 58
7.2.1
HG01: Burner hysteresis ............................................................................................................................ 58
7.2.2
7.2.3
7.2.4
HG09: Burner cycle block .......................................................................................................................... 58
7.2.5
7.2.6
HG13: Function input E1 ............................................................................................................................ 59
7.2.7
HG14: Function output A1 .......................................................................................................................... 60
7.2.8
HG15: Cylinder hysteresis ......................................................................................................................... 61
7.2.9
3066501_201910
......................................................................................................................................... 51
2
2
WOLF GmbH | 03