Decommissioning

9
Decommissioning
NOTE
Improper shutdown!
Pump damaged due to downtime.
Heating system damaged due to frost.
► The heat generator may only be operated using the control module.
9.1

Taking the heat generator out of service temporarily

BM-2 programming unit operating instructions for users
AM display module operating instructions for users
► Activate standby mode using the control module.
9.2

Putting the heat generator back into service

► Activate a heating mode using the control module.
9.3

Taking the heat generator out of service in an emergency

Fig. 9.1
ON/OFF switch
► Switch OFF the heat generator at the ON/OFF switch.
► Notify a contractor.
9.4

Taking the heat generator out of service permanently

Prepare for decommissioning
DANGER
Risk of electrical voltage even when the ON/OFF switch is set to OFF!
Danger of death from electrocution
► Isolate the entire system from the power supply.
► Switch OFF the heat generator at the ON/OFF switch.
► Isolate the system from the power supply.
► Safeguard the system against reconnection.
► Disconnect the heat generator from the power.