Wolf COB-2 Operation Instructions Manual page 70

Oil condensing boiler for central heating with stratification cylinder
Table of Contents

Advertisement

Decommissioning
Draining the heating system
WARNING
Hot water!
Risk of scalding hands from hot water.
► Before working on parts which are in contact with water, allow the appliance to cool to below
40°C.
► Use safety gloves.
WARNING
High temperatures!
Risk of burns on the hands from hot components.
► Before working on the open heat generator, allow it to cool below 40°C.
► Use safety gloves.
► Open the drain valve (e.g. heat generator BDF valve).
► Open the air vent valves on the radiators.
► Drain off the heating water.
Shutting off the oil supply
► Close the oil shut-off valve.
70 | WOLF GmbH
3066501_201910

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cob-2-ts

Table of Contents