ABB Relion 670 Series Applications Manual page 475

Bay control, version 2.1 ansi
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 358-UUS A
18.6
IEC 60870-5-103 communication protocol
18.6.1
Application
IED
ANSI05000660 V4 EN-US
Figure 223: Example of IEC 60870-5-103 communication structure for a substation
IEC 60870-5-103 communication protocol is mainly used when a protection IED communicates
with a third party control or monitoring system. This system must have software that can
interpret the IEC 60870-5-103 communication messages.
When communicating locally in the station using a Personal Computer (PC) or a Remote Terminal
Unit (RTU) connected to the Communication and processing module, the only hardware needed is
optical fibers and an opto/electrical converter for the PC/RTU, or a RS-485 connection depending
on the used IED communication interface.
Functionality
IEC 60870-5-103 is an unbalanced (master-slave) protocol for coded-bit serial communication
exchanging information with a control system. In IEC terminology a primary station is a master
and a secondary station is a slave. The communication is based on a point-to-point principle. The
master must have software that can interpret the IEC 60870-5-103 communication messages. For
detailed information about IEC 60870-5-103, refer to IEC60870 standard part 5: Transmission
protocols, and to the section 103, Companion standard for the informative interface of protection
equipment.
Design
General
The protocol implementation consists of the following functions:
Application manual
Station
HSI
Star coupler
IED
automation system
TCP/IP
Control
Center
Gateway
IED
ANSI05000660-4-en.vsd
Section 18
Station communication
IP14615-1 v2
IP14864-1 v1
M17109-3 v6
M17109-38 v2
M17109-41 v1
M17109-43 v2
469

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents