t2MPh : Time delay of the back-up trip at multi-phase initiate. The critical fault clearance time is
often shorter in case of multi-phase faults, compared to single phase-to-ground faults. Therefore
there is a possibility to reduce the back-up trip delay for multi-phase faults. Typical setting is 90 –
150 ms.
t3 : Additional time delay to t2 for a second back-up trip TRBU2. In some applications there might
be a requirement to have separated back-up trip functions, tripping different back-up circuit
breakers.
tCBAlarm : Time delay for alarm in case of indication of faulty circuit breaker. There is a binary
input 52FAIL from the circuit breaker. This signal is activated when internal supervision in the
circuit breaker detect that the circuit breaker is unable to clear fault. This could be the case when
gas pressure is low in a SF6 circuit breaker, of others. After the set time an alarm is given, so that
actions can be done to repair the circuit breaker. The time delay for back-up trip is bypassed when
the 52FAIL is active. Typical setting is 2.0 seconds.
tPulse : Trip pulse duration. This setting must be larger than the critical impulse time of circuit
breakers to be tripped from the breaker failure protection. Typical setting is 200 ms.
172
Normal t
cbopen
Retrip delay t1
t
cbopen
Minimum back-up trip delay t2
Critical fault clearance time for stability
Trip and Pickup
CCRBRF
(50BF)
after re-trip
t
BFPreset
Margin
1MRK 511 358-UUS A
Time
ANSI05000479_3_en.vsd
Application manual