This structured chart describes the sequence for checking the actuator travel. It also contains
information about the sequence for trimming the lower and upper endstops.
SIPART PS2 with PROFIBUS PA
Operating Instructions, 05/2019, A5E00127926-AC
7.3 Sequence of automatic initialization
Commissioning
113