Installation Checklist; Product Demonstration Checklist - Xerox 3001 Service Manual

Engineering copier 60/50 hz
Table of Contents

Advertisement

Auditron Administrator Training
Locate the individual responsible for
maintaining the copier, and using the 3001
Auditron Administrator Guide, demonstate
the capabilities of the Auditron. Have the
individual perform the procedures and
answer questions that they may have.
a. Management Keylock positions
b.
lnitalize the Auditron
c.
Operating parameters
d. Parameter programming
e. Account code loading
f.
Account maintenance
Emphasize t o the individual that the C9 code
will be displayed on the copier control panel
until a valid Account Number isentered.
Also, tell the individual that the # key must
be pressed after entering the Account Code.
After the Auditron is enabled and initialized,
remind the individual t o remove the key and
keep it in a safe location.
Installation Checklist
Site Preparation
Supply Voltage Check
Soace Reauirements
Installation
Remove the packing material.
Remove the Oil Dispense Assembly
Install the plastic document stops on
the stand
Remove the tie wrap on the
Cleaning Blade Solenoid Weight.
Remove the packing spring from
inside of the Fuser Heat Roll
Install the Photoreceptor Drum
Adjust the Cleaning Blade Solenoid
Check the Pressure Plate and Paper
Guide Plate
Reinstall the Xerographic Module
Reinstall the Oil Dispenser Assembly
Remove the Dry Ink Plus Cartridge.
Level the copier.
Remove foam from inside of the
Developer Module
Add developer
Adjust the Document Return Guide
Remove the plastic covering from the
Platen and the Separator Guide
Assem bl y
Remove the shrink wrap and install
the Dry Ink Plus Cartridge.
Remove the Platen and the Exposure
Lamp
Check for the correct Lens position.
Clean the Platen and reinstall the
platen and the Exposure Lamp
Clean and install the plastic strips on
the Upper Rear Cover
Reinstall the rear and right covers.
Install the Document Handler
Install the User's Guide Pouch
Functional Check
Switch on the copier and allow the
copier t o warm-up.
Perform the Fuser Roll Initialization
Perform the Electrostatic Series
Perform the Toner Solenoid
Adjustment
Perform the Image Darkness
Make five copies.
Check the copy quality.
Product Demonstration Checklist
ONIOFF switch, copy count meter, and
serial number plate
Control Panel
Making the Copies
Scale adjust
Partial Copy
Adding the Dry Ink Plus
Cleaning the Optical System
Problem Solving Status Codes
Clearing the Copier
1 2/98
3001
6-35
3001 Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents