Suzuki RV125 Service Manual page 46

Hide thumbs Also See for RV125:
Table of Contents

Advertisement

3-10
ENGINE
• Tighten the exhaust pipe bolts to the specified torque.
# Exhaust pipe bolt: 23 N·m (2.3 kgf-m)
• Tighten the muffler connecting bolt to the specified torque.
# Muffler connecting bolt: 20 N·m (2.0 kgf-m)
• Install the gearshift lever to the gearshift shaft in the correct
position.
$ Gearshift lever height A: 20 mm
(between footrest top and gearshift lever top)
• After remounting the engine, the following adjustments are
necessary.
* Clutch lever play . . . . . . . . . . . . . . . . . . . . . !2-9
* Throttle cable play . . . . . . . . . . . . . . . . . . . . !2-8
* Engine idle speed . . . . . . . . . . . . . . . . . . . . !2-8
* Drive chain slack . . . . . . . . . . . . . . . . . . . . . !2-12
"
Check the wire routing. (!7-11)
• Pour 1 200 ml of 10W-40 (SAE), SF or SG (API) engine oil
into the engine after overhauling it. Start the engine and allow
it to run for three minutes at idle speed. Turn off the engine
and wait three minutes, and then check the oil level. If the
level is below the "L" line, add oil until the level reaches the
"F" line. (!2-10)
F
F
L
L

Advertisement

Table of Contents
loading

Table of Contents