Start-Up; Initially Applying Power To The System - Roland R1000 Series Manual

Double sheet detector
Hide thumbs Also See for R1000 Series:
Table of Contents

Advertisement

B0046991 / Rev. 1.6
7

Start-up

Pos : 53 /D oppel blech/Geräte/E20/7 Inbetriebnahme/Erstmaliges Einschalten des Gerätes @ 1\mod_1195635381765_501.doc @ 5224 @ 2 @ 1
7.1

Initially applying power to the system

The R1000 E20 is designed for an operating voltage of 24 VDC (+6 V / -2 V). This voltage is to be
checked before applying power. The control unit is automatically switched on by applying the
power.
After applying power, the type of system, the version number and the bus system message are
briefly displayed. Then the system switches into that measurement menu, which was active before
the unit was switched off.
Pos : 54 /D oppel blech/Geräte/E20/7 Inbetriebnahme/Bedi enung @ 1\mod_1192448717265_501.doc @ 4886 @ 2 @ 1
ROLAND ELECTRONIC GmbH · Otto-Maurer-Str. 17 · DE 75210 Keltern · Phone +49 (0)7236-9392-0 · Fax +49 (0)7236-9392-33
Double Sheet Detector R1000 series E20
Manual
Start-up
99

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E20

Table of Contents