WARNING: Do not place anything on power cord(s) or cables. Arrange them so
that no one may accidentally step on or trip over them. Do not pull on a cord or
cable. When unplugging from the electrical outlet, grasp the cord by the plug.
WARNING: To reduce the risk of electric shock or fire, do not plug
telecommunications/telephone connectors into the Network Interface Card (NIC)
receptacles.
3. If you install a switch box in the rack, route the CPU-to-switch-box
cables to the switch box.
4. Bundle all of the cables, including the power cables, and tie them to the
cable management arm.
Figure 4-20. Routing and securing the cables
5. Extend the bundled cables down the rack's cable channel.
Installing the Server 4-29