NOTE: Processors are keyed to fit into the connector one way only.
11. Verify that the interlock LEDs indicate normal activity. See Appendix D
for additional information about locating and reading LED indicators.
CAUTION: If you remove a processor, the processor blanking panel must be
reinstalled before powering up the server. Failure to have either a processor or
processor blank installed results in an interlock fault.
12. Replace the top access panel.
13. Prepare to mount the server in the rack or return the server to its
installed position in the rack. See Chapter 4, "Installing the Server," for
additional information.
14. Reconnect the power cords to the server.
15. Verify that the processor was installed correctly. Check the processor
frequency, cache size, and slot location by reviewing the Power-On
Self-Test (POST) messages on the system console. Refer to the
Integrated Management Log materials on your Documentation CD for
additional information.
Installing Hardware Options 2-11