Delta Electronics AFE075A43A User Manual page 45

Afe2000 series. active front end unit
Table of Contents

Advertisement

Environment
Noise immunity
Operation/storage
Vibration/shock immunity
Install CMC-MOD01 to AFE2000 unit
1.
Turn off the AFE2000 power.
2.
Open up AFE2000 cover.
3.
Place the insulation spacer into the positioning pin at Slot 1 (shown in Figure 3), and aim the two holes on
the PCB at the positioning pin. Press the pin to clip the holes with the PCB (see Figure 4)
4.
Screw up at torque 6 ~ 8 kg-cm (5.21 ~ 6.94 in-lbs) after the PCB is clipped with the holes (see Figure 5).
Communication Parameters for AFE2000 Connected to Ethernet
When AFE 2000 is link to Ethernet, please set up the communication parameters base on the table below.
Ethernet master will be able to read/write the frequency word and control word of AFE C2000 after
communication parameters setup
Parameter (Dec)
01-04
04-21
04-22
04-23
ESD(IEC 61800-5-1,IEC 6100-4-2)
EFT(IEC 61800-5-1,IEC 6100-4-4)
Surge Teat(IEC 61800-5-1,IEC 6100-4-5)
Conducted Susceptibility Test(IEC 61800-5-1,IEC 6100-4-6)
Operation: -10°C ~ 50°C (temperature), 90% (humidity)
Storage: -25°C ~ 70°C (temperature), 95% (humidity)
International standard: IEC 61800-5-1, IEC 60068-2-6/IEC 61800-5-1, IEC
60068-2-27
Slot 3
Slot 2
Slot 1
[Figure 3]
[Figure 5]
Function
Set value (Dec)
Source of operation
command setting
IP setting
IP address -1
IP address -2
Chapter 7 Option CardsAFE2000 Series
The operation command is controlled by
2
communication card.
0
Static IP(0) / Dynamic distribution IP(1)
192
IP address 192.168.1.5
168
IP address 192.168.1.5
7-43
[Figure 4]
Explanation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents