Field Service Ver. 1.0 May 2006
Maintenance
2.
Periodical check
2.1
Maintenance procedure (Periodical check parts)
2.1.1
Replacing the Separation Roller
[2]
[4]
[3]
OK
1. Slide out the Tray.
2. Open the Vertical transport door.
3. Remove two Claws [1], and remove
[1]
4039F2C048DA
4. Remove two Screws [3], and remove
NOTE
• Make sure the position of the Mylar
when installing the Jam processing
cover.
[3]
NG
4039F2C049DA
2. Periodical check
the Vertical transport door [2].
the Jam processing cover [4].
3