2. Periodical check
[6]
[8]
[9]
[10]
[13]
10
[7]
[6]
4067F2C502DA
[8]
4067F2C503DA
[11]
4067F2C504DA
[12]
[14]
[13]
4067F2C510DA
Field Service Ver. 1.0 May 2006
5. Remove four Screws [6] and remove
the Feed Roller Assy [7].
6. Remove two Screws [8], and remove
the Separation Roller installation
plate Assy [9] together with Frame.
7. Remove two Screws [10] and Feed
Roller cover [11].
8. Remove two C-rings [12] and two
Bushings [13], and remove the Pick-
up Roller Assy [14].