POWR
9. Connect the fuel hose l.
l
10. Connect the PTT motor leads d, and
then install the junction box cover.
d
PTT motor lead bolt m:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
11. Connect the battery leads n.
n
12. Install the rigging grommet, and then
connect the shift cable and throttle cable,
see "Mounting the rigging grommet" (3-
8).
13. Install the flywheel magnet cover.
7-25
Power unit
m
m
d