Power Unit Assembly - Yamaha F150B Service Manual

Hide thumbs Also See for F150B:
Table of Contents

Advertisement

POWR
TIP:
Leave the pin inserted into the hole k of the
timing belt tensioner until the timing belt is
installed again.
9. Remove the timing belt from the driven
sprockets, and then from the drive
sprocket.
10. Install the new timing belt with its part
number in the upright position, from the
drive sprocket side to the port side driven
sprocket
and
sprocket,
in
direction.
11. Turn the drive sprocket clockwise 2 full
turns, and then check that alignment
marks c and d, g and h are aligned.
7-19
Power unit
the
starboard
driven
the
counterclockwise
c
12. Adjust the timing belt to the specified
installation height m.
Timing belt installation height m:
2.0 mm (0.08 in)
13. Install the stator assembly (lighting coil)
b and blowby hose a, and then connect
the pulser coil coupler f and stator
assembly coupler e. See exploded
diagram (7-5).
b
f
e
14. Install the Woodruff key and flywheel
magnet. See "Installing the flywheel
magnet" (7-6).
15. Install the flywheel magnet cover.
d
h
g
m
a

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fl150b

Table of Contents