3. Disconnect the ISC coupler a.
4. Turn the engine start switch to "ON," and
then measure the ISC input voltage at
the ISC coupler terminal and ground.
R/Y
R/Y
ISC input voltage:
Red/Yellow (R/Y)–Ground
12.0 V (battery voltage)
5. Turn the engine start switch to "OFF."
6. Remove the junction box cover and the
main relay a, and then disconnect the
engine ECM coupler b.
b
a
7. Check the wiring harness for continuity.
Engine control units and components
b
21
20
19
a
a
Wiring harness continuity:
Terminal 1–Terminal 20
Terminal 2–Terminal c
Terminal 3–Terminal 18
Terminal 4–Terminal 21
Terminal 5–Terminal c
Terminal 6–Terminal 19
8. Install the main relay a.
9. Connect the engine ECM coupler b, and
then install the junction box cover.
10. Connect the ISC coupler a.
18
0
1
2
c
3
4
5
6
7
8
9
10
A
5-18