Acceptance Test And Certificate; General Information About Acceptance - Siemens SINAMICS S120 Installation And Start-Up Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

5.7

Acceptance test and certificate

5.7.1

General information about acceptance

Acceptance test
The machine manufacturer must carry out an acceptance test for the activated
Safety Integrated functions (SI functions) on the machine.
During the acceptance test, all the limit values entered for the enabled SI functions
must be exceeded to check and verify that the functions are working properly.
Authorized persons, acceptance certificate
Each SI function must be tested and the results documented and signed in the ac-
ceptance certificate by an authorized person. The acceptance certificate must be
stored in the machine logbook.
Authorized in this sense refers to a person who has the necessary technical train-
ing and knowledge of the safety functions and is authorized by the machine
manufacturer to carry out the test.
Note
S
Please read the commissioning notes and descriptions in Sections 5.1 to 5.5 in
this Installation and Start-Up Manual.
S
If any parameters are altered by SI functions, the acceptance test must be
carried out again and documented in the acceptance certificate.
S
Template for the acceptance certificate
A printed form is available in this chapter of the Installation and Start-Up
Manual as an example/suggestion.
E Siemens AG, 2004. All rights reserved
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition
SINAMICS Safety Integrated (Booksize)
Acceptance test and certificate
5-177