4. Verify the top LED on the power supply (see
1
2
3
4
5
Locking tab
1
Handle
2
Power LED
3
Predictive failure LED
4
Figure 42: Power Supply and Filler Panel
Core Switch 2/64 V4.1 Installation Guide
d. To install a filler panel, orient it so that the handle is vertical and side tabs
are on right, then push into the slot.
green light. If it does not, make sure that both power cables are plugged in and
both AC switches are turned on.
Figure
6
7
SHR-2524A
Fail LED
5
Top tab (2)
6
Side tab (2)
7
Installing Core Switch 2/64 FRUs
42) displays a steady