Mercury 40 Service Manual page 361

Hide thumbs Also See for 40:
Table of Contents

Advertisement

POWER TRIM
3. Install lower pivot pin. Secure with flat washers and nuts. Torque nuts to specified torque.
a -
4. Install sacrificial anode to clamp brackets. Fasten ground strap between anode and
clamp bracket. Torque bolts to specified torque.
a -
b -
5. Lubricate the upper pivot pin and mounting holes with 2-4-C Marine Lubricant.
6. Fasten shock rod with the upper pivot pin.
NOTE: Pivot pin should be installed with grooved end inserted first.
95
Page 5B-52
a
Nuts
Nut Torque
18 lb-ft (24.4 Nm)
Ground Wire
Sacrificial Anode
Bolt Torque
60 lb-in. (6.8 Nm)
95
2-4-C w/Teflon (92-850736A1)
a
a
a
b
b
90-828631R3 MARCH 1999

Advertisement

Table of Contents
loading

This manual is also suitable for:

4550 bigfoot

Table of Contents