Mercury 40 Service Manual page 111

Hide thumbs Also See for 40:
Table of Contents

Advertisement

CHARGING AND STARTING SYSTEM
6. Install rear bracket. Insert wire insulator into slot and align projection with cut in bracket.
a -
b -
c -
d -
7. Fasten brush card to rear bracket with two screws.
8. Fasten the starter motor together with two through bolts.
a -
b -
Page 2B-24
a
d
O-Ring Seal
Wire Insulator
Align Projection with Cut in the Rear Bracket
Rear Bracket
a
Screw (2) Fasten Brush Card In-Place
Through Bolts (2)
c
b
53832
b
53834
90-828631R3 MARCH 1999

Advertisement

Table of Contents
loading

This manual is also suitable for:

4550 bigfoot

Table of Contents