Sign In
Upload
Manuals
Brands
Binder Manuals
Dryer
vdl 53
Binder vdl 53 Manuals
Manuals and User Guides for Binder vdl 53. We have
2
Binder vdl 53 manuals available for free PDF download: Operating Manual, Mounting Instructions
Binder vdl 53 Operating Manual (109 pages)
vacuum drying ovens for flammable solvents
Brand:
Binder
| Category:
Dryer
| Size: 8 MB
Table of Contents
Table of Contents
2
1 Safety
5
Legal Considerations
5
Structure of the Safety Instructions
5
Signal Word Panel
5
Safety Alert Symbol
6
Pictograms
6
Word Message Panel Structure
7
Localization / Position of Safety Labels on the Chamber
7
Type Plate
8
General Safety Instructions on Installing and Operating the Vacuum Drying Oven
9
Safety Instructions on Installation and Ambient Conditions
10
Safety Instructions on Vacuum Supply
11
Safety Instructions on the Charging Material
12
Safety Instructions on Operating the Vacuum Drying Oven
14
Intended Use
17
Operation Log
17
2 Description of the Equipment
19
Safety Equipment
20
Overview of the Oven
21
VDL Control Panel
22
Connections at the Rear of the Chamber
23
Temperature Setting" Information Panel (Ignition Temperature Vs. Drying Temperature)
24
Overview of the Zone Classification of the Ovens
25
3 Completeness of Delivery, Transportation, Storage, and Installation
27
Unpacking, and Checking Equipment and Completeness of Delivery
27
Guidelines for Safe Lifting and Transportation
28
Storage
28
Location of Installation and Ambient Conditions
28
4 Installation and Connections
30
Vacuum Expansion Racks
30
Vacuum Connection
31
Notes Regarding Use of Vacuum Pumps of Other Manufacturers
33
Inert Gas Connection
33
Compressed Air / Inert Gas Connection for Sweeping the Area for Electrical Equipment
34
Electrical Connection
35
5 Start up
36
Settings at the RD3 Program Controller
36
General Indications
37
6 Fixed Value Entry Mode
39
7 Week Program Editor
41
Program Table Template for the Week Program Editor
43
Programming Example of the Week Program Editor
44
Desired Time Function
44
Proceeding Overview
44
Proceeding in Detail
45
8 Program Editor
50
Selecting between Set-Point Ramp and Set-Point Step
50
Programming with Setting "Ramp" (Default Setting)
50
Programming with Setting "Step
53
General Notes on Programming Temperature Transitions
54
Set-Point Entry for Program Operation
54
Program Table Template
57
Deleting a Program Section
58
9 Program Start Level
59
10 User Level
62
11 Performance in Case of Failures
68
Performance after Power Failures
68
Alarm Messages
68
12 Safety Device Class 2 (Din 12880:2007)
68
13 Reference Measurements. Checking the Temperature in the Inner Chamber
70
14 Commissioning the Vacuum
70
Evacuation
71
Breaking the Vacuum (Flooding with Ambient Air)
71
Operation with Inert Gas
71
15 Options
72
ATEX Connection Kits for Vacuum Pumps VP4 or VP5 (Option)
72
Vacuum Module Empty (Without Pump) (Option)
73
Vacuum Module with Chemical Membrane Pump VP4 or VP5 (Option)
75
Additional Measuring Channel for Digital Object Temperature Display with Flexible Pt 100 Temperature Sensor (Option)
78
Measuring Access Port Vacuum 9 Poles (Option)
80
Communication Software APT-COM™ 3 Datacontrolsystem (Option)
80
16 Maintenance, Cleaning, and Service
81
Maintenance Intervals, Service
81
Cleaning and Decontamination
82
Cleaning
82
Decontamination
83
Sending the Chamber Back to BINDER Gmbh
85
17 Disposal
85
Disposal of the Transport Packing
85
Decommissioning
86
Disposal of the Chamber in the Federal Republic of Germany
86
Disposal of the Chamber in the Member States of the EC Except for the Federal Republic of Germany
87
Disposal of the Chamber in Non-Member States of the EC
89
18 Troubleshooting
89
19 Technical Description
91
Factory Calibration and Adjustment
91
Technical Data
91
Equipment and Options (Extract)
93
Accessories and Spare Parts (Extract)
94
Dimensions VDL 23
95
Dimensions VDL 53
96
Dimensions VDL 115
97
20 Certificates and Declarations of Conformity
98
EU Declaration of Conformity
98
TÜV Certificate
101
21 Product Registration
102
22 Contamination Clearance Certificate
103
For Chambers Located Outside USA and Canada
103
For Chambers Located in USA and Canada
106
Advertisement
binder vdl 53 Mounting Instructions (32 pages)
Vacuum Module for Vacuum Drying Ovens
Brand:
binder
| Category:
Oven
| Size: 1 MB
Table of Contents
Deutsch
2
1 Sicherheitshinweise
2
Table of Contents
2
2 Lieferumfang
3
Aufstellung
4
3 Montage des Vakuumtrockenschranks auf dem Vakuummodul
4
Montage des Verbindungsblechs
5
Schlauchanschluss am Vakuumtrockenschrank VD
6
Schlauchanschluss am Vakuumtrockenschrank VDL
6
4 Verlegen der Saugleitung
6
Befestigung des Schlauchs an der Gehäuserückwand
7
5 Kondensat-Auffangwanne
8
6 Herstellung des Potenzialausgleichs Beim VDL
9
Potenzialausgleich zwischen Kondensat-Auffangwanne und Vakuum-Modul
9
Potenzialausgleich zwischen VDL und Vakuummodul
9
Potenzialausgleich zwischen Vakuumpumpe und Vakuummodul
10
7 Anschluss einer Absaugung am Vakuummodul
11
Potenzialausgleich zwischen Vakuummodul und der Ableitfähigen Oberfläche am Aufstellungsort
11
English
12
1 Safety Instructions
12
2 Scope of Delivery
13
Installation
14
3 Mounting the Vacuum Drying Oven on the Vacuum Module
14
Mounting the Connecting Plate
15
Hose Connection at the Vacuum Drying Oven VD
16
Hose Connection at the Vacuum Drying Oven VDL
16
4 Installing the Suction Line
16
Fixing the Hose at the Housing Rear
17
5 Condensate Collecting Tray
18
6 Achieving Equipotential Bonding with VDL
19
Equipotential Bonding between the Condensate Collecting Tray and Vacuum Module
19
Equipotential Bonding between the VDL and Vacuum Module
19
Equipotential Bonding between the Vacuum Pump and the Vacuum Module
20
7 Connection of a Suction System at the Vacuum Module
21
Equipotential Bonding between the Vacuum Module and the Conductive Surface of the Installation Site
21
Français
22
1 Consignes de Sécurité
22
2 Etendue de Livraison
23
Installation
24
3 Montage de L'étuve de Séchage À Vide Sur Le Module de Vide
24
Montage de la Plaque de Raccord
25
Connexion du Tube À L'étuve de Séchage À Vide VD
26
Connexion du Tube À L'étuve de Séchage À Vide VDL
26
4 Disposition du Conduit D'aspiration
26
Fixation du Tube À la Face Arrière du Boîtier
27
5 Bac de Rétention de Condensat
28
6 Création de la Liaison Équipotentielle Chez la VDL
29
Liaison Équipotentielle entre la VDL Et Le Module de Vide
29
Liaison Équipotentielle entre Le Bac de Rétention de Condensat Et Le Module de Vide
29
Liaison Équipotentielle entre la Pompe À Vide Et Le Module de Vide
30
Liaison Équipotentielle entre Le Module de Vide Et la Surface Conductrice Au Lieu D'installation
31
7 Raccordement D'une Aspiration Au Module de Vide
31
Advertisement
Related Products
Binder vdl 23
Binder vdl 115
binder VDL Series
Binder VDL 23-UL
Binder VDL 56
Binder VDL 56-UL
Binder VDL 115-UL
Binder VD 53
binder VD Series
Binder VD 56
Binder Categories
Climate chamber
Laboratory Equipment
Accessories
Oven
Farm Equipment
More Binder Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL