5.
Start up
Solvent-containing air penetrating and concentration in the electrical area of the
chamber.
Explosion hazard.
Before turning on the chamber via the key switch (1), sweep the area for electrical
equipment at least 15 minutes with compressed air or inert gas. Sweeping the area for
electrical equipment must take place during the entire operation, as otherwise the VDL
vacuum drying oven will shut off at all poles.
After connecting the supply lines (chap 4) and checking all safety instructions and conditions of installa-
tion and safe operation, turn on the chamber via the key switch (1):
• Position 0: Oven is not operating
No consumption of compressed air or inert gas in the area for electrical equipment. If the fine dosage
valve (6) is open, inert gas may be used and can reach the ambient air.
• Position I: Oven is operating
If no indication appears in the display of the program controller RD3, the compressed air sup-
ply is probably not properly connected.
Warming chambers may release odors in the first few days after commissioning. This is not a quality de-
fect. To reduce odors quickly we recommend heating up the chamber to its nominal temperature for one
day and in a well-ventilated location.
5.1
Settings at the RD3 program controller
After turning the chamber on with the key switch (1) the controller is in Normal Display / Fixed value op-
eration mode.
Depending on the temperature value entered before, LED (7a) is lit if the heating is active, or no LED is lit
if the actual temperature is equal to or above the set-point.
In Display 1 of the controller the actual temperature value is displayed.
• With inactive week program timer:
In Display 2 of the controller the actual date and time are displayed. Example:
15.05.06 13:52
• With active week program timer:
In Display 2 of the controller the actual date and time and the states of the week program timer chan-
nels are displayed. Examples:
15.05.06 13:52 - -
Channel 1 Off,
Channel 2: Off
Do not use the week program timer when using explosive substances. Make sure in this
case that the week program timer has been deactivated in the User Level (chap. 10).
VDL (E2.1) 05/2016
15.05.06 13:52 -
Channel 1: Off,
Channel 2: On
DANGER
15.05.06 13:52
-
Channel 1: On,
Channel 2: Off
15.05.06 13:52
Channel 1 On,
Channel 2: On