Code Marking With Electrical Wires; Connector Assignement Engine; Connector Assignement Wiring Harness - Hatz Diesel 1D30 S Workshop Manual

1 d series
Table of Contents

Advertisement

Code marking with electrical wires

Connector assignement Engine

Socket connector
Pin connector
0 Battery - (earth)
1 Battery +
2 Terminal L at regulator with flywheel generator
3 Starter terminal 50
4 Oil pressure switch
5 Temperature switch on cylinder head
6 Preheat glowplug
7 Engine shutdown solenoid
14 Speed control solenoid - holding-on winding
22 Terminal W for engine-speed measurement
24 Terminal C with regulator on flywheel generator
28 Speed control solenoid (energising winding)
For removal of pin and socket connectors use tool -1-.

Connector assignement Wiring harness

Pin connector
Socket connector
4
1D . . / 03.06

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents