Putting Into Operation After Storage - KTM 1190 RC8 R USA Owner's Manual

Hide thumbs Also See for 1190 RC8 R USA:
Table of Contents

Advertisement

STORAGE

Putting into operation after storage

18.2
Cover the motorcycle with a porous sheet or blanket.
Info
Do not use non-porous materials since they prevent humidity from escaping,
thus causing corrosion.
Avoid running the engine for a short time only. Since the engine cannot warm
up properly, the water vapor produced during combustion condenses and causes
valves and exhaust system to rust.
Take the motorcycle off of the front wheel stand. (
Remove the rear of the motorcycle from the lifting gear. (
Recharge the battery.
Install the battery.
Set the clock with SET CLOCK. (
Fill up with fuel. (
Perform checks and maintenance measures when preparing for use. (
Take a test ride.
401059-01
x
(
p. 201)
x
(
p. 200)
p. 93)
p. 122)
p. 163)
p. 164)
p. 114)
238

Advertisement

Table of Contents
loading

Table of Contents