Putting Into Operation After Storage - KTM 250 SX-F 2017 Owner's Manual

Hide thumbs Also See for 250 SX-F 2017:
Table of Contents

Advertisement

19
STORAGE
19.2

Putting into operation after storage

Install the battery.
Remove the motorcycle from the lift stand. (
Perform checks and maintenance measures when preparing for use. (
Take a test ride.
401059-01
(
p. 81)
p. 40)
100
p. 22)

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 250 SX-F 2017 and is the answer not in the manual?

This manual is also suitable for:

250 xc-f 2017250 sx-f factory edition 2017

Table of Contents

Save PDF