PART NAMES • SETTINGS • SETUP2
Setup
Install the bracket.
1
Installation to a wall
1
While aligning the bracket base with the setup
position, make four marks on the wall at the mounting
bolt locations. Then make holes in these locations for
the four M8 anchor bolts and insert the M8 bolts.
2
Make a hole for the connection cables in the wall in
the middle of the bracket installation surface, and pull
the cables all together through the wall to the outside.
3
Pass the connection cables through the hole in the
bracket, and then align the bracket base with the four
M8 bolts and tighten the M8 nuts to secure the bracket
in place.
• You can use the mounting brackets (sold separately)
shown in the illustrations below to install the camera to
the corner of a wall or to a pillar. (Ask the place of
purchase for details.)

Connect the cables.

2
Connect all of the cables that have been passed through
the bracket.
1
Video output cable: Connect to the BNC connector
that is coming out from the top of the main cover.
After making the connection, slide the insulation cover
to hide the connectors.
2
Communication cable: Connect to the terminals on
the connection board inside the main cover.
3
Power supply cable: Connect to the terminals on the
connection board inside the main cover.
Refer to "1 Connection board" in "PART NAMES" for
details on connecting to the terminals on the connection
board.
NOTE: Adjust each cable so that they will not be subjected to
any outside interferences and then fix the cables in
this position.
English
VCC-9000INCP/INSP, VCC-9100INCP/INSP
Installation to a ceiling
1
Loosen the anchor bolts
then turn the bracket base to remove it.
2
While aligning the bracket base with the setup
position, make four marks on the ceiling at the
mounting bolt locations. Then make holes in these
locations for the four M8 anchor bolts and insert the
M8 bolts.
3
Make a hole for the connection cables in the ceiling in
the middle of the bracket installation surface, and pull
the cables all together through the ceiling to the
outside.
If routing the cables along the surface of the ceiling,
use the cable groove
4
Pass the connection cables through the hole in the
bracket, and then align the bracket base with the four
M8 bolts and tighten the M8 nuts to secure the bracket
in place.
5
After passing the connection cables through the
bracket, screw the bracket back onto the bracket base
and securely tighten the screw
2
3
- 7 -
A
of the bracket base, and
B
in the bracket base.
A
.
B
A
1

Advertisement