Appliance Preparation - Valor Portrait 530ILN/ILP Installation & Operating Instructions Manual

Direct vent gas fireplace heater
Hide thumbs Also See for Portrait 530ILN/ILP:
Table of Contents

Advertisement

See venting accessories list on pages 32–33 for allowable components.
Co-linear Vent Installations
1.
The size of the fireplace cavity required to insert the 530 engine varies with the
style of front trim chosen. Refer to the front trim installation manual for required
dimensions.
.
Place the appliance (fitted with the co-linear adapter) near the fireplace opening but
allow space for manipulating the chimney liners on to the appliance.
.
Drop the 3" dia. flexible liners into the chimney from outside.
.
Fit the liners to the co-linear adapter paying attention to inlet and exhaust and move
the appliance to its proper position. Be aware of the minimum liner bend radius and
maximum liner horizontal run as shown on page 14 in this manual.
.
Fit the termination kit and flashing if required to the exterior of the chimney.
.
Secure the appliance to the floor or wall if necessary.
Window Removal
1.
Release the top of the window by pulling forward and rotating
outwards the two bars at the top corners.
.
Unscrew the two spring-loaded bolts securing the bottom of the
window.
.
Carefully lift the window. Keep the window and bolts in a safe
place.
.
Remove the packaged ceramic Bricks/Logs/Coals from firebox.
Burner Module Removal
It may be desirable to remove the burner module to gain access
for gas fitting, to install a fan kit, or to fasten the unit to the floor or
plinth supplied with the zero clearance fronts.
1
1
Vertical Termination Installations

Appliance Preparation

530
engine
2 x 3"
liners

Advertisement

Table of Contents
loading

This manual is also suitable for:

Portrait 530icn/icp

Table of Contents