8. Reconnect the external cables and power cords, and
turn on the peripheral devices and the server.

Completing the installation

Attention: For correct cooling and airflow, install the cover
To complete the installation, you must reinstall the cover,
reconnect all the cables that you disconnected earlier and,
for certain options, run the Configuration/Setup Utility
program. Follow the instructions in this section.
Note: If you have just plugged the power cords of the
server into an electrical outlet, you will have to wait
approximately 20 seconds before pressing the
power-control button.

Installing the cover

The following illustration shows how install the server side
cover.
Note: The illustrations in this document might differ slightly
from your hardware.
70
Hardware Maintenance Manual: xSeries 200
before turning on the server. Operating the
server for extended periods of time (over 30
minutes) with the top cover removed might
damage server components.