VKI Technologies Eccellenza Express Service Manual page 39

Hide thumbs Also See for Eccellenza Express:
Table of Contents

Advertisement

9. Disconnect the temperature probe wiring.
a) The inline connector for the temperature probe is located at the rear of the
machine, above the power supply.
b) Once disconnected, pull the inline connector (on the probe harness)
through the channel in the corner above the power supply.
10. Connect the wiring on the new temperature probe.
a) Pass the inline connector on the temperature probe harness through the
channel in the corner above the power supply.
b) Connect the temperature probe to the inline connector on the machine
harness.
11. Insert the new temperature probe into the grommet on top of the water tank.
12. Re-install the right side panel and close the rear service panel.
13. Re-install the bean dispenser motor assembly.
14. Re-install the bean dispensers.
15. Re-install the top cover.
July 15, 2015
Eccellenza Express – Service Manual
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents